Cables, Wires, Gutters, Pipes & Roof

A lot going on this week with changes to the soil stack, guttering, plumbing and electrics.  Also by the end of the week the roofing felt was on giving a bit of rain protection and time for the slab to dry out before the insulation and screed is laid.